Featured Project
Infrastructure – Ongoing

180 MWp Solar Power Project, Civil Infrastructure Works – Tuticorin, Tamil Nadu

December 2024 β€’ By AARAA Infrastructure Pvt. Ltd.
AARAA Infrastructure Pvt. Ltd. is playing a key role in enabling large-scale clean energy generation in Tamil Nadu through the 180 MWp Solar Power Project at Tuticorin, delivering robust civil infrastructure that supports long-term solar performance.

About the 180 MWp Solar Power Project

AARAA Infrastructure has been entrusted by Waaree Energies Ltd. to execute the civil infrastructure development works for their upcoming 180 MWp Solar Power Project in Tuticorin, Tamil Nadu. This engagement underscores our expertise in delivering reliable, large-format infrastructure for utility-scale solar parks.

From earthworks and internal roads to robust foundations and drainage networks, every element is engineered to support the performance and longevity of the solar assets installed on site.

Scope of Civil Infrastructure Works

  • Site grading and earthworks to prepare a stable platform for the solar park.
  • Internal roads and drainage to enable smooth movement of equipment and safe storm-water management.
  • Foundations and pedestals for MMS/structures and equipment platforms supporting solar modules and critical systems.
  • Perimeter development and approach access including boundary treatments and connectivity to external roads.
  • Quality control, compaction, and finishing in strict line with client specifications and project standards.

Building Infrastructure for Renewable Energy

Solar power plants depend on precise civil engineering for long-term reliability. With disciplined project management and on-site execution, AARAA Infrastructure Pvt. Ltd. ensures that all civil and ancillary works are delivered safely, on schedule, and in compliance with stringent quality benchmarks.

This project further strengthens our portfolio in the Infrastructure – Renewable Energy segment, supporting India’s transition towards sustainable power generation.

Key Project Highlights

  • Location: Tuticorin, Tamil Nadu
  • Capacity: 180 MWp Solar Power Project
  • Client: Waaree Energies Ltd.
  • Contract Value: Approx. β‚Ή11 Crores
  • Status: Infrastructure – Ongoing
  • Scope: Civil Infrastructure Works for Solar Park

Frequently Asked Questions

What type of project is this?

This is a utility-scale 180 MWp solar power project requiring extensive civil infrastructure development for the solar park.

What civil works are handled by AARAA Infrastructure?

We are responsible for site grading, earthworks, internal roads, drainage, foundations, pedestals, perimeter development, approach access, and associated finishing works.

Who is the end client for the project?

The project is being executed for Waaree Energies Ltd., a leading solar energy company.

How does this project contribute to clean energy?

The project creates the physical backbone for 180 MWp of solar generation capacity, directly supporting green energy availability in the region.

Where is the project site located?

The site is located in Tuticorin, Tamil Nadu, a strategic location for harnessing solar energy at scale.

Partner with AARAA Infrastructure Pvt. Ltd.

From renewable energy parks to large-format industrial and infrastructure projects, we deliver dependable civil engineering solutions across India.

Phone: +91 868 100 3111
Website: aaraainfrastructure.com
Call Now

Explore More AARAA Projects

Water infrastructure project
400 MLD SWRO Desalination Project
πŸ“ Perur, Tamil Nadu
View project β†’
Institutional building construction work
Institutional Development – VIBGYOR Group
πŸ“ Hinjewadi, Pune
View project β†’
Highway and infrastructure works
Urban Infrastructure & Road Works
πŸ“ Tamil Nadu
View all projects β†’