Verified Flagship Reference: 140.6 MW Wind-Solar Hybrid Power Project, Kudligi
AARAA Infrastructure served as the primary civil, structural, and electrical BoP partner for the benchmark 140.6 MW Capacity Wind–Solar Hybrid Power Project in Kudligi, Karnataka. Our execution encompassed large-scale site leveling across semi-arid terrain, rock drilling and pile anchoring for MMS arrays, 33kV collection lines, and 110kV pooling substation civil structures.
Engineered for North Karnataka’s Solar Corridor
Kudligi and the surrounding Bellary-Chitradurga solar belt feature high solar irradiation coupled with complex geological terrain requiring robust structural civil engineering:
- Hard-Rock & Gravel Geotechnical Piling: Kudligi’s hard-strata geology requires DTH pneumatic rock-drilling and specialized concrete piers to anchoring MMS arrays against severe wind load uplift.
- Hybrid Wind-Solar Integration Civil Scope: Managing civil execution across co-located wind turbine foundations and expansive solar PV fields requires synchronized heavy machinery logistics and access road network construction.
- Substation & KPTCL Evacuation Facilities: Construction of 33/110kV pooling switchyards, transformer foundation pads, oil-soak pits, and control room buildings for seamless KPTCL grid synchronization.
Turnkey Scope for Independent Power Producers (IPPs)
We provide full-spectrum engineering, procurement support, and civil/electrical execution for renewable energy IPPs in Karnataka:
- Site Preparation & Internal Logistics: Topographic contour surveys, heavy grading, perimeter fencing, and all-weather arterial access roads.
- Solar PV & MMS Civil Scope: MMS table erection, pile pull-out testing, DC cabling trenches, and inverter station foundations.
- Electrical BoP & Switchyard Infrastructure: Underground HT AC cabling, outdoor breaker foundations, lightning protection masts, and SCADA control rooms.
Why Partner with AARAA Infrastructure in Kudligi?
With direct ground execution experience on a 140+ MW hybrid power project in Kudligi, AARAA brings deep regional familiarity with Bellary soil conditions, local labor management, material supply chains, and KPTCL grid interconnection compliance.
Frequently Asked Questions
What project reference does AARAA have in Kudligi, Karnataka?
We completed major civil, structural, and BoP packages for the 140.6 MW Wind-Solar Hybrid Power Project in Kudligi, Bellary district.
How do you handle rocky soil conditions during piling in Kudligi?
We deploy DTH rock-drilling rigs and heavy pre-cast concrete pier anchoring tested rigorously with pull-out load trials.
Does AARAA service the broader North Karnataka renewable corridor?
Yes. Our equipment fleet and engineering teams cover Kudligi, Gadag, Chitradurga, Ballari, and surrounding Karnataka solar parks.