About the 180 MWp Solar Power Project
AARAA Infrastructure has been entrusted by Waaree Energies Ltd. to execute civil infrastructure works for their 180 MWp Solar Power Project at Tuticorin, Tamil Nadu.
This project supports India’s renewable energy expansion by delivering durable, performance-driven civil infrastructure that enables long-term solar generation efficiency.
Scope of Civil Infrastructure Works
- Site grading and earthworks for solar park development
- Foundations and pedestals for MMS structures and equipment
- Internal roads and storm-water drainage systems
- Perimeter development and access infrastructure
- Quality control and finishing works as per project standards
Building Infrastructure for Utility-Scale Solar
Utility-scale solar projects require precision engineering and structured civil execution. AARAA Infrastructure ensures safe, compliant, and durable infrastructure delivery aligned with client specifications.
Key Project Highlights
- Location: Tuticorin, Tamil Nadu
- Capacity: 180 MWp
- Client: Waaree Energies Ltd.
- Value: ₹11 Crores
- Status: Ongoing
Frequently Asked Questions
What is the capacity of this project?
The project has a total capacity of 180 MWp.
Who is the client?
The project is executed for Waaree Energies Ltd.
What civil works are included?
Grading, foundations, internal roads, drainage and associated civil works.
Where is the project located?
Tuticorin, Tamil Nadu.
What is the contract value?
Approximately ₹11 Crores.
Partner with AARAA Infrastructure Pvt. Ltd.
From renewable energy parks to large-format industrial and infrastructure projects, we deliver dependable civil engineering solutions across India.
Phone: +91 868 100 3111Website: aaraainfrastructure.com Call Now