About the Solar EPC Project at Kudligi
AARAA Infrastructure Pvt. Ltd. has been entrusted with executing civil infrastructure works for the 132.26 MW Wind–Solar Hybrid Project at Kudligi, Karnataka, awarded by Continuum Green Energy Ltd..
This hybrid renewable energy development integrates wind and solar generation to optimize power output and grid stability. Our role focuses on building the essential civil backbone required for long-term operational efficiency and structural reliability.
Scope of Civil Infrastructure Works
- Site grading and earthworks to establish stable platforms for solar arrays and associated structures.
- Piling and foundations for MMS structures and equipment platforms.
- Internal roads and drainage systems to ensure efficient site mobility and storm-water management.
- Perimeter development and access roads for secure and structured site operations.
- Quality control and finishing works executed in strict adherence to project specifications and safety standards.
Delivering Infrastructure for Hybrid Renewable Energy
The Wind–Solar Hybrid model requires high-precision civil execution to ensure alignment, structural durability, and operational stability. AARAA Infrastructure combines technical expertise and disciplined project management to deliver safe, compliant, and future-ready infrastructure solutions.
This project further strengthens our portfolio in the Infrastructure – Renewable Energy segment across India.
Key Project Highlights
- Location: Kudligi, Karnataka
- Capacity: 132.26 MW Wind–Solar Hybrid Project
- Client: Continuum Green Energy Ltd.
- Contract Value: Approx. ₹20 Crores
- Status: Infrastructure – Ongoing
- Scope: Civil Infrastructure Works for Solar EPC Project
Frequently Asked Questions
Frequently Asked Questions
What is the capacity of the Solar EPC Project at Kudligi?
The project forms part of a 132.26 MW Wind–Solar Hybrid renewable energy development in Karnataka.
Who is the client for this project?
The project has been awarded by Continuum Green Energy Ltd.
What civil works are executed by AARAA Infrastructure?
AARAA Infrastructure handles grading, piling, foundations, internal roads, drainage systems, and other associated civil works.
Where is the project located?
The project site is located at Kudligi in Karnataka.
Why is hybrid renewable infrastructure important?
Hybrid renewable projects improve power optimization and grid efficiency by combining wind and solar generation assets.
Partner with AARAA Infrastructure Pvt. Ltd.
From renewable energy parks to large-format industrial and infrastructure projects, we deliver dependable civil engineering solutions across India.
Phone: +91 868 100 3111Website: aaraainfrastructure.com Call Now