AARAA Infrastructure undertook ITC foundation works at the Kudligi solar project in Karnataka, covering foundation requirements associated with ITC-02 and ITC-03.
The documented work order identifies the project as the 77.4 MWp / 48.4 MW SWPPL Solar Project, Kudligi, Karnataka.
The work package represents a specialized component of large-scale solar infrastructure execution, where accurate foundation positioning, civil construction and site coordination are essential for the installation of project equipment and associated infrastructure.
Foundation works are a critical part of renewable-energy infrastructure. At the Kudligi solar project, AARAA Infrastructure's documented scope covered ITC foundation works for ITC-02 and ITC-03.
The work formed part of the civil infrastructure required within the solar project and required coordination between site conditions, foundation requirements, construction activities and subsequent project installations.
Project Details
| Particular | Details |
|---|---|
| Project Name | Kudligi Solar Project — ITC Foundation Works |
| Location | Kudligi, Karnataka |
| Project Identity | 77.4 MWp / 48.4 MW SWPPL Solar Project |
| Work Package | ITC Foundation Works |
| ITC Areas | ITC-02 & ITC-03 |
| Project Type | Solar Power Infrastructure |
| Contractor | AARAA Infrastructure |
ITC Foundation Works
The project work package specifically focused on ITC foundation construction. Foundation works require accurate execution to ensure that the completed civil infrastructure corresponds with the project's design and installation requirements.
AARAA Infrastructure's execution approach focuses on:
The exact construction methodology and quantities remain subject to the project drawings, specifications and approved work package.
ITC-02 & ITC-03
The documented work order specifically identifies ITC-02 and ITC-03 as the areas associated with the foundation work.
This makes the project distinct from AARAA's other Kudligi work packages, including the separate 20 MWp MMS drilling, concreting and alignment works.
Solar Foundation Construction Sequence
Foundation infrastructure within a solar project requires coordination between civil execution and downstream installation activities:
AARAA Infrastructure's role is to execute the assigned civil scope in coordination with the project's engineering and site requirements.
Working in Rocky Site Conditions
The documented revision specifically records a price revision associated with rocky-area conditions.
This is an important project-specific detail because ground conditions can materially affect the execution methodology, productivity and resource requirements of foundation construction.
Rather than presenting the site as a standard soil-condition project, the case study highlights the requirement to execute foundation works under the documented rocky site conditions.
Kudligi Renewable Energy Portfolio
The ITC foundation project forms part of AARAA Infrastructure's broader renewable-energy work at Kudligi, Karnataka. Other documented Kudligi work packages include:
These remain separate project/case-study pages because they represent different work packages and technical scopes across multiple stages of renewable-energy infrastructure execution.
Construction Progression & Civil Gallery (20 WebP Views)
Complete chronological sequence of the 77.4 MWp / 48.4 MW SWPPL Solar Project (ITC-02 & ITC-03 Foundation Works) at Kudligi, Karnataka—from site survey & trenching to foundation concreting, MMS piling, cable trenches, transformer erection, and completed site handover (20 WebP Views):
Phase 01: Site Boundary Survey & Topography — Kudligi site boundary survey, benchmark marking, and topographic mapping in rocky terrain.
Phase 02: Land Clearing & Ground Levelling — Heavy machinery site clearing, boulder removal, and subgrade levelling for solar block.
Phase 03: Trench & Foundation Excavation — Heavy excavator foundation trenching and rock-cut excavation for main ITC block.
Phase 04: PCC Sub-Base Bed Casting — Plain Cement Concrete (PCC) level sub-base bed casting for inverter transformer foundation.
Phase 05: Heavy Rebar Mesh Binding for ITC-02 — Heavy structural steel rebar grid binding & reinforcement for ITC-02 transformer pad.
Phase 06: Anchor Bolt Setting & Starter Steel — High-precision anchor bolt setting, template fixing, and column starter steel layout.
Phase 07: Heavy Metallic Shuttering Formwork — Heavy metallic shuttering formwork assembly and side bracing for ITC foundation.
Phase 08: Monolithic M35 Concrete Pouring — Continuous monolithic M35 grade anti-corrosive concrete pouring for heavy inverter pad.
Phase 09: Concrete Curing & Quality Check — Wet hessian cloth concrete curing and cube compressive strength testing quality check.
Phase 10: MMS Hydraulic Hard Rock Piling Rig — Hydraulic pile drilling rig operating in hard rock layers for solar MMS foundations.
Phase 11: MMS Pile Grouting & Alignment — Concrete grouting, vertical alignment, and curing of solar MMS pile foundations.
Phase 12: ITC-03 Inverter Pad Civil Works — Completed civil foundation infrastructure for ITC-03 inverter transformer room.
Phase 13: Reinforced RCC Cable Trench & Drainage — Reinforced RCC cable trench construction and peripheral stormwater drainage civil execution.
Phase 14: Substation Switchyard Foundations — Substation switchyard equipment foundations and gantry civil structure execution.
Phase 15: Galvanized Steel MMS Structure Mounting — Galvanized steel MMS racker structure mounting and torque tightening on cast foundations.
Phase 16: Solar PV Module Panel Installation — High-efficiency solar PV module panel mounting, row alignment, and stringing.
Phase 17: Inverter Transformer Heavy Erection — Heavy inverter transformer equipment placement and positioning on cast ITC foundation.
Phase 18: Substation Gantry Yard Overview — Substation gantry yard civil infrastructure and high-voltage equipment layout overview.
Phase 19: Operational Solar Block Array Overview — Operational solar block array overview showing completed civil works and MMS rows.
Phase 20: Completed 77.4 MWp Kudligi Solar Project (HERO) — Completed 77.4 MWp Kudligi Solar Power Project & Civil Infrastructure.
Project Highlights
Work undertaken within the 77.4 MWp / 48.4 MW SWPPL Solar Project.
Dedicated ITC foundation work package.
Renewable-energy infrastructure execution in Karnataka.
Foundation works specifically associated with the identified ITC areas.
Additional considerations associated with rocky ground conditions.
Foundation construction requiring coordination, accuracy and quality control.
AARAA Infrastructure — Solar Civil Infrastructure
AARAA Infrastructure executes civil and infrastructure work packages supporting renewable-energy projects. Our documented renewable-energy experience includes:
Our multidisciplinary capabilities across Civil, Interior and MEP enable coordinated execution of project-specific infrastructure requirements.
Planning Civil Infrastructure for a Solar Project?
AARAA Infrastructure provides project-specific civil execution for solar foundations, MMS-related works, site infrastructure and associated renewable-energy construction requirements.
Discuss Your Solar Infrastructure Project With AARAA →