Kudligi Solar Project — ITC Foundation Works
HomeBlogDetails
Renewable Energy

Kudligi Solar Project — ITC Foundation Works

Solar Foundation Infrastructure in Karnataka: Dedicated civil foundation construction for ITC-02 & ITC-03 under the 77.4 MWp / 48.4 MW SWPPL Solar Project at Kudligi, Karnataka.

Kudligi, Karnataka
4 min read
Kudligi, Karnataka
💡

Executive Summary & Key Highlights

Solar Foundation Infrastructure in Karnataka: Dedicated civil foundation construction for ITC-02 & ITC-03 under the 77.4 MWp / 48.4 MW SWPPL Solar Project at Kudligi, Karnataka.

Project Overview

AARAA Infrastructure undertook ITC foundation works at the Kudligi solar project in Karnataka, covering foundation requirements associated with ITC-02 and ITC-03.

The documented work order identifies the project as the 77.4 MWp / 48.4 MW SWPPL Solar Project, Kudligi, Karnataka.

The work package represents a specialized component of large-scale solar infrastructure execution, where accurate foundation positioning, civil construction and site coordination are essential for the installation of project equipment and associated infrastructure.

Foundation works are a critical part of renewable-energy infrastructure. At the Kudligi solar project, AARAA Infrastructure's documented scope covered ITC foundation works for ITC-02 and ITC-03.

The work formed part of the civil infrastructure required within the solar project and required coordination between site conditions, foundation requirements, construction activities and subsequent project installations.

Project Details

Particular Details
Project Name Kudligi Solar Project — ITC Foundation Works
Location Kudligi, Karnataka
Project Identity 77.4 MWp / 48.4 MW SWPPL Solar Project
Work Package ITC Foundation Works
ITC Areas ITC-02 & ITC-03
Project Type Solar Power Infrastructure
Contractor AARAA Infrastructure

ITC Foundation Works

The project work package specifically focused on ITC foundation construction. Foundation works require accurate execution to ensure that the completed civil infrastructure corresponds with the project's design and installation requirements.

AARAA Infrastructure's execution approach focuses on:

✓ Site preparation
✓ Foundation setting-out
✓ Civil construction
✓ Reinforcement & concrete activities
✓ Quality control
✓ Dimensional accuracy
✓ Site coordination
✓ Safe construction practices

The exact construction methodology and quantities remain subject to the project drawings, specifications and approved work package.

ITC-02 & ITC-03

The documented work order specifically identifies ITC-02 and ITC-03 as the areas associated with the foundation work.

This makes the project distinct from AARAA's other Kudligi work packages, including the separate 20 MWp MMS drilling, concreting and alignment works.

Solar Foundation Construction Sequence

Foundation infrastructure within a solar project requires coordination between civil execution and downstream installation activities:

Site Preparation → Setting Out → Foundation Construction → Quality & Dimensional Checks → Readiness for Subsequent Installation

AARAA Infrastructure's role is to execute the assigned civil scope in coordination with the project's engineering and site requirements.

Working in Rocky Site Conditions

The documented revision specifically records a price revision associated with rocky-area conditions.

This is an important project-specific detail because ground conditions can materially affect the execution methodology, productivity and resource requirements of foundation construction.

Rather than presenting the site as a standard soil-condition project, the case study highlights the requirement to execute foundation works under the documented rocky site conditions.

Kudligi Renewable Energy Portfolio

The ITC foundation project forms part of AARAA Infrastructure's broader renewable-energy work at Kudligi, Karnataka. Other documented Kudligi work packages include:

These remain separate project/case-study pages because they represent different work packages and technical scopes across multiple stages of renewable-energy infrastructure execution.

Project Highlights

☀️ Large-Scale Solar Infrastructure

Work undertaken within the 77.4 MWp / 48.4 MW SWPPL Solar Project.

🏗️ Foundation Construction

Dedicated ITC foundation work package.

📍 Kudligi, Karnataka

Renewable-energy infrastructure execution in Karnataka.

🔩 ITC-02 & ITC-03

Foundation works specifically associated with the identified ITC areas.

🪨 Rocky-Area Conditions

Additional considerations associated with rocky ground conditions.

📐 Civil Execution

Foundation construction requiring coordination, accuracy and quality control.

AARAA Infrastructure — Solar Civil Infrastructure

AARAA Infrastructure executes civil and infrastructure work packages supporting renewable-energy projects. Our documented renewable-energy experience includes:

Solar Civil Infrastructure Solar Foundations MMS-Related Civil Works Site Development Geotechnical-Related Works Pile Testing Road & External Infrastructure Industrial Civil Works

Our multidisciplinary capabilities across Civil, Interior and MEP enable coordinated execution of project-specific infrastructure requirements.

Planning Civil Infrastructure for a Solar Project?

AARAA Infrastructure provides project-specific civil execution for solar foundations, MMS-related works, site infrastructure and associated renewable-energy construction requirements.

Discuss Your Solar Infrastructure Project With AARAA →

Shaping India's Modern Landscape

Partner with AARAA Infrastructure Pvt. Ltd. to experience engineering precision, fast-track mobilization, and structured sustainable developments.

Reliance Construction PartnerBlue Star Infrastructure ClientVIBGYOR Institutional ClientWaaree Solar EPC PartnerContinuum Green Energy PartnerSaint-Gobain Industrial PartnerSRM University Institutional DevelopmentL&T Construction CollaborationCommercial Real Estate PartnerLogistics Park DeveloperCorporate Facilities PartnerPEB Steel Supplier PartnerInfrastructure Development PartnerEnergy Sector PartnerCivil Engineering PartnerIndustrial Construction PartnerUrban Development PartnerReal Estate Development PartnerPower Infrastructure PartnerSmart City Infrastructure PartnerTurnkey Project PartnerConstruction Technology PartnerReliance Construction PartnerBlue Star Infrastructure ClientVIBGYOR Institutional ClientWaaree Solar EPC PartnerContinuum Green Energy PartnerSaint-Gobain Industrial PartnerSRM University Institutional DevelopmentL&T Construction CollaborationCommercial Real Estate PartnerLogistics Park DeveloperCorporate Facilities PartnerPEB Steel Supplier PartnerInfrastructure Development PartnerEnergy Sector PartnerCivil Engineering PartnerIndustrial Construction PartnerUrban Development PartnerReal Estate Development PartnerPower Infrastructure PartnerSmart City Infrastructure PartnerTurnkey Project PartnerConstruction Technology Partner