Kudligi Solar Project — MMS Drilling, Concreting & Alignment
HomeBlogDetails
Renewable Energy

Kudligi Solar Project — MMS Drilling, Concreting & Alignment

Solar Civil Infrastructure Works in Karnataka: Survey marking, MMS pile drilling, concreting, and structural alignment for Block II — 20 MWp at Kudligi, Karnataka.

Kudligi, Karnataka
4 min read
Kudligi, Karnataka
💡

Executive Summary & Key Highlights

Solar Civil Infrastructure Works in Karnataka: Survey marking, MMS pile drilling, concreting, and structural alignment for Block II — 20 MWp at Kudligi, Karnataka.

Project Overview

AARAA Infrastructure undertook survey marking, MMS drilling, concreting and alignment works for a solar project at Kudligi, Karnataka.

The documented work package covers Block II — 20 MWp and focuses on the accurate preparation and execution of the infrastructure required for the Module Mounting Structure (MMS) installation.

The project demonstrates AARAA Infrastructure's capabilities in executing specialized solar civil and site-development works, where survey accuracy, foundation positioning, drilling, concreting and structural alignment are critical to subsequent solar-module installation.

Solar projects require precise coordination between surveying, civil works and Module Mounting Structure installation. At the Kudligi project, AARAA Infrastructure's documented work package covered the preparation and execution of MMS-related civil works for Block II — 20 MWp.

The work involved establishing accurate locations through survey marking, carrying out drilling and concreting activities and ensuring appropriate alignment for the subsequent installation process.

Project Details

Particular Details
Project Name Kudligi Solar Project — MMS Drilling, Concreting & Alignment
Location Kudligi, Karnataka
Project Capacity / Block Block II — 20 MWp
Project Type Solar Power Infrastructure
Scope of Execution Survey Marking, MMS Drilling, Concreting & Alignment
Contractor AARAA Infrastructure

Survey Marking

Accurate survey marking is a fundamental stage of solar-site execution. Before drilling and concreting activities begin, the required locations need to be established according to the project layout.

The documented scope included survey marking, providing the positioning reference for the subsequent MMS-related works.

This stage is particularly important because inaccuracies in positioning can affect the installation and alignment of downstream structural components.

MMS Drilling

The project scope included MMS drilling for the solar installation. Module Mounting Structures require accurately positioned foundations or supports to accommodate the solar-module mounting system.

AARAA Infrastructure's work package involved carrying out the required drilling activities in accordance with the designated project locations and execution requirements.

Concreting Works

Following the drilling activities, the scope included concreting works associated with the MMS infrastructure. Concrete works form an important part of establishing the required support infrastructure for the mounting system.

The execution required coordination between:

Survey → Drilling → Concreting → Alignment

to maintain consistency across the installation area.

MMS Alignment

Alignment is a critical component of Module Mounting Structure preparation. Accurate positioning and alignment help ensure that the completed foundation/support system is ready for subsequent MMS installation and solar-module deployment.

The Kudligi work package therefore combined the preceding civil activities with MMS alignment, creating an integrated execution sequence rather than treating drilling and concreting as isolated activities.

Integrated Solar Civil Execution Sequence

The project demonstrates the importance of coordinating multiple activities during solar-site construction. The documented sequence can be represented as:

Survey Marking → MMS Drilling → Concreting → Alignment → MMS Installation Readiness

This integrated approach helps maintain consistency across the solar project site.

Solar Infrastructure Execution

AARAA Infrastructure's renewable-energy project experience includes civil and infrastructure activities associated with large-scale solar developments. The company's capabilities include project-specific execution across:

Solar Civil Infrastructure
Site Development
Survey-Related Execution
MMS Foundation Works
Drilling Works
Concreting Works
Foundation-Related Works
Solar Project Roads
RE Construction Support

The exact scope of each project is determined by the applicable work package and project requirements.

Kudligi Renewable Energy Portfolio

The MMS drilling and concreting project forms part of AARAA Infrastructure's broader Kudligi renewable-energy project portfolio. Other documented Kudligi work packages include:

Together, these projects demonstrate AARAA's involvement across multiple stages of renewable-energy infrastructure execution.

Project Highlights

☀️ 20 MWp Solar Block

The documented work package covers Block II — 20 MWp.

📐 Survey Marking

Accurate site positioning for MMS-related civil execution.

🛠️ MMS Drilling

Drilling works supporting the Module Mounting Structure infrastructure.

🏗️ Concreting

Concrete works associated with the MMS support system.

📏 Alignment

Alignment activities supporting subsequent MMS installation.

📍 Kudligi, Karnataka

Renewable-energy infrastructure execution at a solar project in Karnataka.

AARAA Infrastructure — Solar EPC & Civil Infrastructure

AARAA Infrastructure provides civil and infrastructure execution capabilities for renewable-energy projects, including solar project development and associated civil works. Our project experience spans:

Solar Civil Infrastructure Foundations MMS Works Site Development Roads Industrial Civil Works

With multidisciplinary execution capabilities across Civil, Interior and MEP, AARAA Infrastructure supports clients with project-specific turnkey construction requirements.

Building a Solar Project?

From site development and civil infrastructure to MMS-related works, foundations and associated construction, AARAA Infrastructure supports renewable-energy projects with coordinated field execution.

Discuss Your Solar Infrastructure Project With AARAA →

Shaping India's Modern Landscape

Partner with AARAA Infrastructure Pvt. Ltd. to experience engineering precision, fast-track mobilization, and structured sustainable developments.

Reliance Construction PartnerBlue Star Infrastructure ClientVIBGYOR Institutional ClientWaaree Solar EPC PartnerContinuum Green Energy PartnerSaint-Gobain Industrial PartnerSRM University Institutional DevelopmentL&T Construction CollaborationCommercial Real Estate PartnerLogistics Park DeveloperCorporate Facilities PartnerPEB Steel Supplier PartnerInfrastructure Development PartnerEnergy Sector PartnerCivil Engineering PartnerIndustrial Construction PartnerUrban Development PartnerReal Estate Development PartnerPower Infrastructure PartnerSmart City Infrastructure PartnerTurnkey Project PartnerConstruction Technology PartnerReliance Construction PartnerBlue Star Infrastructure ClientVIBGYOR Institutional ClientWaaree Solar EPC PartnerContinuum Green Energy PartnerSaint-Gobain Industrial PartnerSRM University Institutional DevelopmentL&T Construction CollaborationCommercial Real Estate PartnerLogistics Park DeveloperCorporate Facilities PartnerPEB Steel Supplier PartnerInfrastructure Development PartnerEnergy Sector PartnerCivil Engineering PartnerIndustrial Construction PartnerUrban Development PartnerReal Estate Development PartnerPower Infrastructure PartnerSmart City Infrastructure PartnerTurnkey Project PartnerConstruction Technology Partner