Project Overview
AARAA Infrastructure undertook survey marking, MMS drilling, concreting and alignment works for a solar project at Kudligi, Karnataka.
The documented work package covers Block II — 20 MWp and focuses on the accurate preparation and execution of the infrastructure required for the Module Mounting Structure (MMS) installation.
The project demonstrates AARAA Infrastructure's capabilities in executing specialized solar civil and site-development works, where survey accuracy, foundation positioning, drilling, concreting and structural alignment are critical to subsequent solar-module installation.
Solar projects require precise coordination between surveying, civil works and Module Mounting Structure installation. At the Kudligi project, AARAA Infrastructure's documented work package covered the preparation and execution of MMS-related civil works for Block II — 20 MWp.
The work involved establishing accurate locations through survey marking, carrying out drilling and concreting activities and ensuring appropriate alignment for the subsequent installation process.
Project Details
| Particular | Details |
|---|---|
| Project Name | Kudligi Solar Project — MMS Drilling, Concreting & Alignment |
| Location | Kudligi, Karnataka |
| Project Capacity / Block | Block II — 20 MWp |
| Project Type | Solar Power Infrastructure |
| Scope of Execution | Survey Marking, MMS Drilling, Concreting & Alignment |
| Contractor | AARAA Infrastructure |
Survey Marking
Accurate survey marking is a fundamental stage of solar-site execution. Before drilling and concreting activities begin, the required locations need to be established according to the project layout.
The documented scope included survey marking, providing the positioning reference for the subsequent MMS-related works.
This stage is particularly important because inaccuracies in positioning can affect the installation and alignment of downstream structural components.
MMS Drilling
The project scope included MMS drilling for the solar installation. Module Mounting Structures require accurately positioned foundations or supports to accommodate the solar-module mounting system.
AARAA Infrastructure's work package involved carrying out the required drilling activities in accordance with the designated project locations and execution requirements.
Concreting Works
Following the drilling activities, the scope included concreting works associated with the MMS infrastructure. Concrete works form an important part of establishing the required support infrastructure for the mounting system.
The execution required coordination between:
to maintain consistency across the installation area.
MMS Alignment
Alignment is a critical component of Module Mounting Structure preparation. Accurate positioning and alignment help ensure that the completed foundation/support system is ready for subsequent MMS installation and solar-module deployment.
The Kudligi work package therefore combined the preceding civil activities with MMS alignment, creating an integrated execution sequence rather than treating drilling and concreting as isolated activities.
Integrated Solar Civil Execution Sequence
The project demonstrates the importance of coordinating multiple activities during solar-site construction. The documented sequence can be represented as:
This integrated approach helps maintain consistency across the solar project site.
Solar Infrastructure Execution
AARAA Infrastructure's renewable-energy project experience includes civil and infrastructure activities associated with large-scale solar developments. The company's capabilities include project-specific execution across:
The exact scope of each project is determined by the applicable work package and project requirements.
Kudligi Renewable Energy Portfolio
The MMS drilling and concreting project forms part of AARAA Infrastructure's broader Kudligi renewable-energy project portfolio. Other documented Kudligi work packages include:
Together, these projects demonstrate AARAA's involvement across multiple stages of renewable-energy infrastructure execution.
Project Highlights
The documented work package covers Block II — 20 MWp.
Accurate site positioning for MMS-related civil execution.
Drilling works supporting the Module Mounting Structure infrastructure.
Concrete works associated with the MMS support system.
Alignment activities supporting subsequent MMS installation.
Renewable-energy infrastructure execution at a solar project in Karnataka.
AARAA Infrastructure — Solar EPC & Civil Infrastructure
AARAA Infrastructure provides civil and infrastructure execution capabilities for renewable-energy projects, including solar project development and associated civil works. Our project experience spans:
With multidisciplinary execution capabilities across Civil, Interior and MEP, AARAA Infrastructure supports clients with project-specific turnkey construction requirements.
Building a Solar Project?
From site development and civil infrastructure to MMS-related works, foundations and associated construction, AARAA Infrastructure supports renewable-energy projects with coordinated field execution.
Discuss Your Solar Infrastructure Project With AARAA →