AARAA Infrastructure undertook geotechnical investigation and pile testing works for a solar project at Kudligi, Karnataka, supporting the technical design and foundation preparation.
The documented work package included pull-out tests, compression tests, and lateral tests, together with associated drilling, testing, and soil investigation activities.
Pile Testing Methodology
⬆️ Pull-Out Testing
Evaluates pile resistance against upward uplift forces generated by high wind speeds on solar arrays.
⬇️ Compression Testing
Measures foundation settlement and load-bearing capacity under downward structural loads.
↔️ Lateral Testing
Assesses horizontal displacement and shear resistance under lateral wind shear forces.
Project Highlights
Rigorous load-cell calibration and test data collection.
Key technical investigation supporting utility-scale solar engineering.
Planning Foundation & Civil Works for a Solar Project?
AARAA Infrastructure provides project-specific execution for solar civil infrastructure, pile testing, foundation works, and site development.
Discuss Your Solar Project →












































